GRK Civils is proud to have been a key partner in delivering the Astley High School redevelopment project in Seaton Delaval, Northumberland. This ambitious initiative, overseen by BAM Construction and Northumberland County Council, will provide state-of-the-art educational and sports facilities for over 1,000 students and the wider community. With sustainability at its core, this project exemplifies innovation, collaboration, and a commitment to creating a net-zero carbon operation.

Expertise in action

Our involvement in this project spanned a comprehensive 32-week program, during which GRK Civils delivered exceptional groundwork and formwork services. Highlights of our scope of work include:

  • Mass Fill Pad Foundations: Over 200 foundations poured, totalling approximately 1,800m³ of concrete.
  • Substructure and Superstructure: Construction of the ground floor slab, waterproof membrane installation, and concrete topping to SMD metal decking for upper floors.
  • Installation of drainage systems, including two large attenuation tanks:
  • a. Off-site car park tank: 440m² surface area, 502m³ capacity. The installation included Aqua Cell units, a full membrane wrap, and backfilling, achieving a significant milestone at this crucial project area.

    b. On-site tank: 1764m² surface area, 2100m³ capacity—GRK’s largest attenuation tank to date. Our expert crew made impressive headway with the membrane installation reaching 60% completion, followed by the installation of NG Aqua-Cell units.

    • Swimming Pool Construction: Complex formwork and concrete pours for the pool’s gradient base slab and FRC walls, working closely with Myrtha Pool Specialists.
    • Off-Site Car Park: Development of an 11,000m² car park to streamline traffic flow and ensure safe access for students and staff.

Sub-structure

Foundations and structural works for the main school and sports buildings, Attenuation tanks and drainage.

Sub-structure

Foundations and structural works for the main school and sports buildings, Attenuation tanks and drainage.

Superstructure

Upper floors for main school and sports buildings.

Superstructure

Upper floors for main school and sports buildings.

Overcoming Unique Challenges

Astley High School’s redevelopment presented several logistical and technical challenges, each of which GRK Civils overcame with meticulous planning and execution:

  • Weather Conditions: Persistent rainfall prior to project commencement left the site waterlogged, requiring extensive de-watering systems and strategically placed water pumps.
  • Accelerated Timelines: Despite a tight schedule, our team completed the foundation phase over two weeks ahead of program due to thorough pre-construction planning and daily progress meetings.
  • Proximity Coordination: Managing multiple trades and high volumes of plant and operatives required robust site management to ensure safety and efficiency.

External Works

Off site car park.

Pre-construction

Site logistics, sustainability planning.

External Works

Off site car park.

Pre-construction

Site logistics, sustainability planning.

Project-Specific Highlight

One of the standout features of this project is the integration of cutting-edge sports facilities, including a Sports England 4G pitch and MUGA pitches, complemented by the meticulously constructed swimming pool. Drone imagery captured the pool frame’s intricate detailing, a testament to GRK’s precision and expertise.

Beyond the technical achievements, our team’s engagement with the local community exemplified GRK Civils’ commitment to creating positive relationships. A local resident, Chris, a retired lumberjack, contributed a handcrafted windmill now proudly displayed on-site as a symbol of community connection.

Conclusion

The Astley High School redevelopment showcases GRK Civils’ ability to deliver complex, high-profile projects with professionalism and innovation. By collaborating with BAM Construction and other stakeholders, we have laid the foundation for a facility that will serve as a beacon of education and community engagement for generations.